Sunday. Day of rest. Day of rest? No. More like, day of ALL the rest – all the rest of the projects that could not be completed during the regular work week.

1aSunday1

Can’t let the summer heat go to waste. Instead of boiling water to set inside the frosted-over freezer to speed up the melting, that 90+ degree heat outdoors is making for a quick disappearance of all that icy buildup. No boiling water. No drippy mess on the kitchen floor. (I have containers on the sidewalk to catch the run-off, but all the little splashes are evaporating about as quickly as they hit the deck.)

Those of us still living in the defrost age have a decided advantage. Those frost-free freezers and refrigerators don’t have a built-in cleaning reminder. Of course, Dustin and I aren’t dirtying-up the interior by tossing in open pans of spaghetti sauce or some such thing (my son Dustin and I are sharing kitchen duties as of a couple of weeks ago – what a godsend that has been!). We take care to keep up with it, but there are some projects that are out of the regular cycle. Like today’s episode.

1aSunday2

I sprayed and paper-toweled the freezer interior as it became visible from under the layer of frost, but there wasn’t a lot to clean. The defrosting brings about a forced reminder to clean the floor under the freezer, the appliance interior, and the top of the thing.

Sometimes I think we need those sorts of personal-defrosting moments that would allow us to scrub up our life-fringes. But that’s a project for some other Sunday.

While the freezer sits outside drawing the attention of passersby, I’ve taken the opportunity to address a couple of the tables. Attached a metal strap under the wooden top that was damaged in transit and only lately began to become an issue. Added another in a separate area as an insurance measure. Tightened the screws on the legs. Same drill for a second table.

1aSunday3

I’d love to spend more time under this air conditioning vent typing up progress reports, but I’ve got to get that frozen food out of the backup unit and into the freezer.

Here’s one thing that was reinforced already today, as a result of the projects: There is no honest work accomplished without busting a knuckle or two.

I’ve busted one already.

Nine to spare.

Come visit!

McHuston

Booksellers & Irish Bistro
Rose District
122 South Main St. Broken Arrow OK!