Rare, Collectible, & Otherwise

Tag: construction

Movin’ & Shakin’ on Main…

Dishes are stacked in the kitchen. They are waiting. I am waiting, too. A break in the action. Today was Red Hat Lady Day. I’ll get to the washing and cleaning in a minute.

The tables at lunchtime were turned over to the group today, and since I’m still a one-man show with limited seating, it threw a kink in the dining plans of a couple of parties of nice folks who had driven over from Tulsa. I hope to be able to make it up to them in the near future.

In truth, this afternoon I was a one-man show with help from a kind-hearted sister. Kathy was kind enough to bring in a helper to cover at her store – Martha’s Heath Food and Herbs – so she could come down the street and bail out her brother by carrying bowls and refilling tea and lemonade glasses. A great help in serving all the Red Hatters at once. (Thanks, Sis!)

Meanwhile, the Ladies were suitably-attired in their matching-color-appropriate hats and enjoyed Irish stew, bread, and fresh-baked cookies before convening their meeting. I snapped a photo of the tables, all ready and waiting. Needless to say, once the chairs were filled there was no more time for my photography.

It wasn’t the only dining action in the Rose District today, although the chewing in the next block south was being done by a big, growling machine. They’ve taken down the building that will be replaced by a new structure to accommodate the In The Raw sushi restaurant. It’s great to see progress, even if it means seeing it with demolition-created-dust blowing into the eyeballs.

I took a stroll down to the bank (not remembering it closes at 4pm, just like in the olden days) and decided to snap a shot of the construction-destruction.

According to an email from one of my merchant neighbors, it was quite a show when it came down yesterday. One of my lunchtime guests yesterday mentioned there was work going on at the site, but I figured it was more of the just-puttering-around kind. Didn’t realize it was the kind of activity that brings down the house. Literally.

So, goodbye to a vintage Broken Arrow structure that probably dated to statehood, and hello to plans for a structurally-sound replacement that will help revive the commerce on Main Street.

Great things are in the works and great work is going on already.

Come visit!

McHuston

Booksellers & Irish Bistro
Rose District
122 South Main Street, BA

A Mid-February Building Report.

Maybe the updates should appear more frequently, the longer the building renovation continues. I don’t want anyone to lose faith!

In the picture, our space is down the street, on the left – just beyond the Main Street Tavern – where a black canopy is visible. Just above the back of that parked black vehicle. The awning used to be there with letters claiming Francy Law Firm. It is gone for the duration of the facade remodel. We’ll be between Gowns and More and Star Jewelers.

At the risk of repeating progress reports, here is the latest as of the second week of February:

The floor tiles, beautiful and durable with the appearance of natural wood, are nearly complete through the main retail area. The building features a long, long hallway and the installation extends most the way to the back. Looking at it, I’m reminded of the real wooden plank floors at Paddy’s Irish Restaurant, my enterprise in Tulsa of a decade ago.

When Mr. S commented that he preferred plank-type tiles over the other choices presented, my heart skipped a beat. I didn’t want to be the first in favor of the more expensive tiles the contractor offered. I believe they will give an Old World feel that will compliment the century-old pressed tin ceiling tiles that remain from the original building interior. The interior already reminds me of the Palace News, my grandfather’s business in Parsons, Kansas.

The kitchen is well on its way to completion, with more personal thanks due the building’s owner. The health department requirements are fairly stringent. I’m afraid I assumed those rules were common knowledge, but the renovation required changes more extensive than might have been originally contemplated. Again, Mr. S came through, and the result will be a sparkling kitchen with new ceiling, walls, plumbing, and flooring.

What is left from the original break-room kitchen, you ask? Nothing, mostly. It will be so new and shiny that I might be tempted to eat a meal right on the floor. The required dish and hand sinks are delivered and waiting installation.

Equipment for the new kitchen is being collected, and food warmers, a tea urn, a machine for brewing delicious coffee, and soup-special kettles are in hand, ready to be installed.

Walls have been primed and painted. Front glass and door installed. The building façade is still on the to-do list and will likely be among the last projects, but the most visible to those of us driving by.

The completely remodeled restrooms are being wall-tiled behind the wide and newly installed doors. The areas are compliant with disability-access regulations and big enough that I might have confused them with reading rooms.

When is the Grand Re-opening?

I still am better with predicting book sequels and publication dates than construction project endings. My eyes are telling me that it may be very soon, perhaps in the vicinity of weeks. Mr John, the contractor, told me it could February. He said that some months ago, but he is a professional, and his work is proof he is no amateur.

If it runs beyond the end of the month, I won’t be surprised, knowing full-well there is no way I could oversee completion of the project in that length of time. I learned my lesson in predicting the packing of the store inventory in the previous location. Sometimes, it just takes longer than anticipated.

Still, given his abilities and experience, I would not be surprised if Mr John brought it in to the finish line in the fifteen days or so remaining. I better get busy on my end!

Hope to see you soon!

McHuston

Building update: progress and regress.

Finding the building for our new location has taken an abrupt change. We’ve been telling folks that the new store will be in the building in downtown Broken Arrow identified by the big storefront canopy that reads – Francy Law Firm.

Well.

The canopy is gone. I’m not really sure about the reason or rationale. I liked the canopy a lot. I considered changing the name of the bookstore to Francy Law Firm, just so I wouldn’t have to change the awning (I guess that is a more correct description…). Just kidding about the name change thing. Regardless, I did like the awning.

It still says Francy Law Firm on the front door. The building is still next to Star Jewelers.

The construction on the interior continues and we still are not in, as of today. The contractor says February. There have been some snags about the food service and initially our offerings along that line may be limited. The kitchen is being constructed and once the store is opened there will be a short lag while the menu is finalized. We’ll have something to offer when you stop in, and we’ll be working on the tasty offerings that may be accommodated by the kitchen.

It looks to me like the store interior is going to be fantastic, and I hope you’ll come visit as soon as we are re-opened. Your patience is certainly appreciated!