Rare, Collectible, & Otherwise

Tag: Broken Arrow (Page 131 of 141)

A Mid-February Building Report.

Maybe the updates should appear more frequently, the longer the building renovation continues. I don’t want anyone to lose faith!

In the picture, our space is down the street, on the left – just beyond the Main Street Tavern – where a black canopy is visible. Just above the back of that parked black vehicle. The awning used to be there with letters claiming Francy Law Firm. It is gone for the duration of the facade remodel. We’ll be between Gowns and More and Star Jewelers.

At the risk of repeating progress reports, here is the latest as of the second week of February:

The floor tiles, beautiful and durable with the appearance of natural wood, are nearly complete through the main retail area. The building features a long, long hallway and the installation extends most the way to the back. Looking at it, I’m reminded of the real wooden plank floors at Paddy’s Irish Restaurant, my enterprise in Tulsa of a decade ago.

When Mr. S commented that he preferred plank-type tiles over the other choices presented, my heart skipped a beat. I didn’t want to be the first in favor of the more expensive tiles the contractor offered. I believe they will give an Old World feel that will compliment the century-old pressed tin ceiling tiles that remain from the original building interior. The interior already reminds me of the Palace News, my grandfather’s business in Parsons, Kansas.

The kitchen is well on its way to completion, with more personal thanks due the building’s owner. The health department requirements are fairly stringent. I’m afraid I assumed those rules were common knowledge, but the renovation required changes more extensive than might have been originally contemplated. Again, Mr. S came through, and the result will be a sparkling kitchen with new ceiling, walls, plumbing, and flooring.

What is left from the original break-room kitchen, you ask? Nothing, mostly. It will be so new and shiny that I might be tempted to eat a meal right on the floor. The required dish and hand sinks are delivered and waiting installation.

Equipment for the new kitchen is being collected, and food warmers, a tea urn, a machine for brewing delicious coffee, and soup-special kettles are in hand, ready to be installed.

Walls have been primed and painted. Front glass and door installed. The building façade is still on the to-do list and will likely be among the last projects, but the most visible to those of us driving by.

The completely remodeled restrooms are being wall-tiled behind the wide and newly installed doors. The areas are compliant with disability-access regulations and big enough that I might have confused them with reading rooms.

When is the Grand Re-opening?

I still am better with predicting book sequels and publication dates than construction project endings. My eyes are telling me that it may be very soon, perhaps in the vicinity of weeks. Mr John, the contractor, told me it could February. He said that some months ago, but he is a professional, and his work is proof he is no amateur.

If it runs beyond the end of the month, I won’t be surprised, knowing full-well there is no way I could oversee completion of the project in that length of time. I learned my lesson in predicting the packing of the store inventory in the previous location. Sometimes, it just takes longer than anticipated.

Still, given his abilities and experience, I would not be surprised if Mr John brought it in to the finish line in the fifteen days or so remaining. I better get busy on my end!

Hope to see you soon!

McHuston

An Update: February bookstore report.

Here is a patience update: a thank-you for those of you have called or visited the new location hoping to find an open bookstore.

As of early February, the building – formerly the Francy Law Firm, just north of Commercial on Main Street – has been almost totally gutted by contractors to accommodate the bookstore. The attorneys had offices that were not suited to the retail display of books and the building’s owner, Mr. Roy Sturgeon, graciously agreed to remodel the space for a different purpose.

The contractor, Mr. John Skaggs, of Bixby, and his employees and subcontractors have been producing amazing and beautiful results in turning the structure into a modern-version of a turn-of-the-century storefront. New ceiling beams and columns serve to support the roof, wonderfully stained, and outfitted with elbow-level tables for book viewing or laptop wireless internet.

The century-old, now-rare tin ceiling tiles have been preserved and outfitted with matching corner molding that is painted to match the interior. Heating and air-conditioning ductwork has been moved. The loft has been resituated. Outdated bathrooms have been treated with sledgehammers and replaced with new, wheelchair accessible facilities.

The attorney’s office breakroom has been gutted and is being replaced by a licensed kitchen that will allow the serving of food and beverages.

Tables and chairs are purchased and awaiting delivery.

A beautiful floor is being installed as of Superbowl Sunday, another step in the process of getting shelves located and the book inventory restored. The grout is down. I wanted to walk on it and try it out, but refrained to let it dry.

There is a new front door, and new front window panes. Mr. Skaggs has tested a brick-paint to allow the façade to blend wonderfully into the two adjoining brick buildings. The front has already been thoroughly cleaned and prepped by workers atop a scaffolding.

As for the behind the scenes, non-structure work: meetings have been held to sample the fare that will be offered once the bistro portion of the new operation gets underway. Tables and chairs are at the ready. Cups are waiting to be filled with exotic coffees. Pastries to delight are standing by (well – truth to tell, we’ve eaten those on stand-by, but will have fresh ones ready!).

Credit accounts, as we’ve mentioned, are in place on the computer, and will be transferred in full to the new location.

Books have been purchased to add to the inventory. A new front counter will be installed as soon as feasible – in the meantime it awaits in safe storage.

Our customers have been dearly missed, and certainly your patience has been tested to some degree. Thank you for that.

I am certain you will enjoy the new store.

Bear with us over the coming next weeks as we approach the day the renovations are completed and we begin moving in…

Big News. Big Move. Downtown BA.

The countdown has begun.

Broken Arrow’s Main Street bookstore is moving into the downtown proper – happy to be part of the grand plans and exciting renovations that will re-energize our pioneer commercial district.

Interior renovation work is underway on the building at our planned new location, just north of the Main Street Tavern, which will allow for a bright display of our inventory.

There is a small snag.

Our current leasing arrangement has expired, and while the landlord allowed an additional month, we are currently unsure whether the new location will be ready previous to December 1. The store inventory is currently being boxed for moving and there may be a brief interlude between the closing of the current location and the opening of the new.

All trade account balances will be preserved and continued at the new location.

Broken Arrow officials have great aspirations for the downtown area, and McHuston Booksellers hopes to be a contributing part of the district’s reemergence as a destination location.

« Older posts Newer posts »